288 riders/hr
2-Train Ops
Operations
—
Operating Mode
Avg Cycle Time
3:25
Rolling avg · last 10 dispatches
Capacity
288riders/hr
18 trains/hr · 16 riders
Trains / Hour
18
Theoretical at current cycle
Queue Wait
~22min
Based on last AI scan
Line Cut Predictor
✂
Cut Line At
—
Targeting 5:00 PM close
Park close 5:00 PM
Buffer 10 min
Cycle Logger
Track dispatch intervals and crew assignments
Dispatch Timer
0:00.0
Ready
Crew Assignments
Today's Log
No dispatches logged yet.
SOI Audits
Standard Operating Inspection · Wooden Coaster
0 Pass
0 Needs Impr.
0 Fail
Queue Vision
Photo-based rider count estimation
Analyze Queue Photo
Tap to upload · AI-powered rider count
How it works
Capture the queue from the Preload Op vantage point. AI estimates rider count, recommends 1-train vs 2-train ops based on queue density and current cycle time.